COMPLETED PROJECTS
BM HOLDING
1998
Job Title
:
Ankara Hipodromu
Work Done
:

Manfacturing and Erection of
the Covered Grandstand’s Steel
Construction

ŞEREFOğLU CONSTRUCTION
1999
Job Title
:
Bayrampaşa Belediyesi İşmerkezi
Work Done
:

Manufacturing and Erection of the Steel
Roof

ÇORUM CEMENT ( CETA MACHINERY INC )
1999
Job Title
:
Ekipman Montajı
Work Done
:

Erection of Seperator, Bag Filter,
Elevator and Air Slides

ADO CEMENT INC
2001
Job Title
:
Antalya II.Çimento Öğütme Tesisi
Work Done
:

Cement Mill Erection

CETA MACHINERY CO. INC
2001
Job Title
:
Akcansa Çimento Fabrikası
Work Done
:

Increasing of Capasity Dynamic
Seperator
Modification of 1st Cement Mill

MIMAG MACHINERY
2002
Job Title
:
Sugözü Termik Santrali
Work Done
:

Erection of Concrete Stack’s Inner
Platform ( 287 ton )
Manufacturing and Erection of Inner
Gas Ducts of Concrete Stack
( Ø 7200 mm )

GAMA TEKFEN ORDINARY PARTNERSHIP
2003
Job Title
:
Sugözü Termik Santrali
Work Done
:

Erection of 1st Unit Stack’s Gas Ducts
Erection of 1st Unit Pump Building
Erection of UVE Tanks
Cleaning and Grinding of Welded Areas
Prior to Rubber Lining of Inner Surfaces of
HTD Tanks ( 5174 m² )

ÇİMSA ( CETA MACHINERY CO. INC )
2005
Job Title
:
Kayseri Çimsa Çimento Fabrikası
Work Done
:

Erection of Cooling Tower

ÇİMSA ( CETA MACHINERY CO. INC )
2005
Job Title
:
Ekipman Montajı
Work Done
:

Erection of Electro Filter and Stack
Erection of Rotary Kiln and Clinker
Cooler

AS CEMENT INC
2005
Job Title
:
Kızılkaya Çimento Fabrikası
Work Done
:

Manufacturing and Erection of ACT
Calcinatory Pre-Heater with a Capacity of
3300 ton/day
Rotary Kiln/Clinker Cooler and Electro Filter
Manufacturing and Erection
Manufacturing and Erection of LM2500
Loesche and MPS 3200 Vertical Raw mill
Hummer Crusher Unit that is Blessed with a
Capacity of 500 ton/hour

CIMPOR YIBITAS
2006
Job Title
:
Ankara Hasanoğlan 2. Çimento Değirmen Ünitesi
Work Done
:

Erection of Cement Ball Mill Steel
Structure Transfer Towers and Steel
Structure of Gallery
Erection of Bag Filter, Seperator, Air
Slides and Piping

CIMPOR YIBITAS 2
2006
Job Title
:
Ankara Hasanoğlan 2. Çimento Değirmen Ünitesi
Work Done
:

Cement Ball Mill and Its Gearbox
Erection

VICAT KONYA CEMENT
2006
Job Title
:
Filtre Dönüşümü
Work Done
:

Transformation of Raw Mill Electro
Filters into Bag Filter

VICAT KONYA CEMENT
2006
Job Title
:
Çimento Silosu İmalat ve Montajı
Work Done
:

Manufacturing and Erection of Interior
and Exterior Equipment Belong to
Chamber Cement Silo

AS CEMENT INC
2008
Job Title
:
2.Klinker Üretim Hattı
Work Done
:

Cyclone Manufacturing and Erection of
the Pre-Heater Building that is blessed
with 8000 ton/day

AS CEMENT INC
2008
Job Title
:
2.Klinker Üretim Hattı
Work Done
:

Manufacturing and Erection of Electro Filter
Manufacturing and Erection of Hot Gas
Ducts
Structural Steel Manufacturing and Erection
Manufacturing and Erection of Gas Ducts,
Pipes and Stack

OYAK GROUP ( ALFER ENGINEERING )
2010
Job Title
:
Adana Çimento Fabrikası
Work Done
:

Transformation of Electro Filters into
Bag Filter

OYAK GROUP ( ALFER ENGINEERING )
2010
Job Title
:
Ünye Çimento Fabrikası
Work Done
:

Bag Filter Manufacturing

ALKİM ALKALI CHEMICALS INC ( ALFER ENGINEERING )
2010
Job Title
:
Sodyum Sülfat Tesisi
Work Done
:

Manufacturing of Silo that is blessed
with 1000 ton Capasity and Its Steel
Supports

SINTEK MINING
2011
Job Title
:
Çayırhan Kül Tesisi
Work Done
:

Steel Construction Manufacturing and
Erection

SANKO ( ALFER ENGINEERING )
2011
Job Title
:
Adıyaman Çimento Fabrikası
Work Done
:

Bag Filter Manufacturing and Erection

LIMAK HOLDING ( ALFER ENGINEERING )
2011
Job Title
:
Urfa Çimento Fabrikası
Work Done
:

Electro Filter Manufacturing and
Erection

MMK ATAKAS ( ALFER ENGINEERING )
2011
Job Title
:
Sıcak Grup Açık Devre Su Sistemi
Work Done
:

Sludge Thickener and Clarifier
Manufacturing

ETI MADEN WORKS GENERAL MANAGMENT ( ELIT PROJECT )
2009
Job Title
:
Bandırma Bor ve Asit Fabrikaları Stok Sahalarının Rehabilitasyonu
Work Done
:

Tinkal and Colemanite Conveyors
Manufacturing and Erection
Wagon Unloading Building
Manufacturing and Erection
Dedusting Systems Manufacturing and
Erection

KONYA ŞEKER
2011
Job Title
:
Et ve Süt Entegre Tesisi
Work Done
:

Steel Construction Manufacturing
( 1000 ton )

ERDEMİR ( FILTEK MACHINERY
2011
Job Title
:
Sinter Fabrikası Elektro Filtre Modernizasyonu
Work Done
:

Electro Filter Manufacturing

İSDEMİR ( FILTEK MACHINERY )
2011
Job Title
:
Sinter Fabrikası Tozsuzlaştırma İşleri
Work Done
:

Piping Between Filter and Fan as well
as Fan and Stack
Flaps Manufacturing

LIMAK HOLDING ( FILTEK MACHINERY )
2011
Job Title
:
Diyarbakır Ergani Çimento Fabrikası
Work Done
:

Bag Filter Manufacturing

ÇIMENTAS HOLDING ( FILTEK MACHINERY )
2011
Job Title
:
İzmir Çimentaş Çimento Fabrikası
Work Done
:

Bag Filter Manufacturing

RöNESANS CONSTRUCTION
2012
Job Title
:
Novorossyk Çimento Fabrikası ( Rusya ) 6000 ton/gün
Work Done
:

Total Weight of Manufacturing : 2700 ton
Total Weight of Erection : 6000 ton
Cyclone Manufacturing and Erection of
the Preheater Building
Manufacturing and Erection of Clinker
Cooling Tower
Rotary Kiln Erection

RöNESANS CONSTRUCTION
2012
Job Title
:
Novoroscement Çimento Fabrikası ( Rusya ), 6500 ton/gün
Work Done
:

Erection of Preheater Building
Gas Conditioning Tower Erection

RöNESANS CONSTRUCTION
2013
Job Title
:
Sebryakovsk Çimento Fabrikası ( Rusya ) 3500 ton/gün
Work Done
:

Manufacturing and Erection of Preheater
Building
Manufacturing and Erection of Clinker Cooler
Rotary Kiln Erection
Electro Filter Disassembly and Erection
Hummer Crusher Building Erection
Manufacturing and Erection of Hummer
Crusher
Bag Filter Manufacturing and Erection
Stacker and Reclaimer Manufacturing and
Erection
Gas Ducts Manufacturing and Erection

EFOR MACHINERY
2013
Job Title
:
Yunus Emre Termik Santrali ( Çayırhan )
Work Done
:

Cyclone and Siphon Manufacturing
(4 Set)

ASKALE CEMENT ( SINTEK MINING )
2013
Job Title
:
Gümüşhane Çimento Fabrikası,4500 ton/gün
Work Done
:

Manufacturing and Erection of Cyclones of
Preheater Building
Raw and Coal Mills Erection
Manufacturing and Erection of Cyclones of
Raw and Coal Mills
Hot Gas Ducts Manufacturing and Erection
Expansion joint , Conveyors and Flaps
Manufacturing and Erection

LIMAK HOLDING ( SINTEK MINING )
2013
Job Title
:
Ankara Çimento Fabrikası
Work Done
:

Manufacturing of Jalousie and Butterfly
Valves Located on the Cement Vertical
Mill

LIMAK HOLDING ( VIBA CONSTRUCTION
2013
Job Title
:
Trakya Çimento Fabrikası
Work Done
:

Steel Manufacturing of Coal Stockhole
Steel Manufacturing of Vertical Cement
Mill Tower and Transport Lines

LIMAK HOLDING ( VIBA CONSTRUCTION )
2013
Job Title
:
Ankara Çimento Fabrikası
Work Done
:

Manufacturing of Platform for Air Slides
Located on Between Raw Mill Cyclones
Buildng and Elevator.

ÜST YAPı CONSTRUCTION
2014
Job Title
:
Kavak Çimento Fabrikası ( Kavçim - Samsun
Work Done
:

Cyclone Manufacturing and Erection of
the Pre-Heater Building
Gas Ducts Manufacturing and Erection
Fan Casing, Seperator Casing and
Hummer Mill Casing Manufacturing and
Erection

ASKALE CEMENT ( VIBA CONSTRUCTION )
2013
Job Title
:
Aşkale Gümüşhane Çimento Fabrikası
Work Done
:

Vertical Cement Mill Erection
Vertical Cement Mill Piping
Manufacturing and Erection
Bag Filter Manufacturing
Elevator Casing Manufacturing

EREN HOLDING ( SINTEK MINING )
2014
Job Title
:
Medcem Çimento Fabrikası
Work Done
:

Bag Filter Manufacturing (3 Set)
Elevator Casing Manufacturing (16 Set)
Loesche Vertical Cement Mill Piping
Manufacturing and Erection
Loesche Vertical Cement Mill Steel
Construction Manufacturing and
Erection
Loesche Vertical Cement Mill Erection

YESILBAS ELEKTRIK ÜRETIM
2008
Job Title
:
Yeşil HES Santral Binası
Work Done
:

Powerhouse Steel Manufacturing and
Erection

ELDA ELEKTRIK
2010
Job Title
:
Dinar Regülatörü ve HES
Work Done
:

Hydromechanical Manufacturing and
Erection

YAğıZ İNSAAT
2013
Job Title
:
Sivas Kangal Çatköy Göleti ve Sulaması
Work Done
:

900X900 Sluice Valve,Bifurication
Reduction and Transition
Manufacturing and Erection

YAğıZ İNSAAT
2014
Job Title
:
Adana Merkez Baklalı Göleti
Work Done
:

950X950 and 650X650 Sluice
Valve, Bifurication, Reduction and
Transition Manufacturing and Erection
Trashracks Manufacturing

DIRGUN İNSAAT
2014
Job Title
:
Antalya Korkuteli Çağman Göleti
Work Done
:

500X500 Sluice Valve,Bifurication,
Reduction and Transition
Manufacturing and Erection

ÖZSA İNSAAT
2014
Job Title
:
Aksaray Ağaçören Kütüklü Göleti
Work Done
:

970X970 and 530X530 Sluice Valve,
Ø 1200 Butterfly Valve,
Bifurication, Reduction and Transition
Manufacturing and Erection

ÖZSA İNSAAT
2014
Job Title
:
Aksaray Merkez Sağır Karaca Göleti
Work Done
:

970X970 and 350X350 Sluice
Valve, Ø 1200 Butterfly Valve,
Bifurication, Reduction and Transition
Manufacturing and Erection

ÖZSA İNSAAT
2014
Job Title
:
Denizli Beyağaç Bövet Göleti
Work Done
:

800X800 and 700X700 Sluice
Valve, Ø 700 Butterfly Valve,
Bifurication, Reduction and Transition
Manufacturing and Erection